Structure & dimensions
Size, assembly, opening and the relevant dieline reference.
Specification & Repeat Orders
Review the approved specification, sample and changes before discussing the next order.
Suggested review process / To confirm with Jinma.
Discuss a Repeat Order
Suggested review process, to confirm with Jinma. This page does not represent an implemented document system, version-numbering policy or consistency guarantee.
Discuss which details need to be recorded and linked for the project.
Confirm the sample, specification, approval responsibility and approval record relevant to the order.
A magnetic interface is an optional closure within the collapsible-box family. Confirm it on the selected model rather than treating it as a separate, incompatible box type.
Review sample approval inputsSize, assembly, opening and the relevant dieline reference.
The material list, artwork version and intended print or finish.
Identify the paper, board, physical colour reference and intended surface. Availability and acceptable differences need agreement.
Product fit, filling requirements, delivery state and carton details.
The sample, approval responsibility and documents to use for the order.
Suggested process / To confirm with Jinma. The boxes below are editable HTML information nodes, not actual project records.
Identify the physical reference and what was approved.
Link the construction, artwork and material references.
Identify changes and agree what needs reconfirming.
Confirm the applicable reference and any agreed changes before the next order.
Discuss how the applicable version is identified and how an earlier version is handled.
No actual order, material specification or production approval is represented.
Record the reason, the affected details and who needs to confirm the revision. Agree how the earlier version is taken out of use.
Bring the earlier reference back into the discussion and make the next requirement clear.
Discuss the earlier reference and the materials relevant to the next order.
Reconfirm the artwork version and the physical colour reference.
Review order quantities, target dates and any changed requirements.
Review the delivery state, cartons and receiving requirements.
Define the communication points and the people involved. Project updates need an agreed context.
Review owners, records and handover arrangements are to confirm for the project.
Discuss the applicable version, open changes and the confirmation needed to proceed.
Agree who reviews its impact and how the next decision is communicated.
Confirm the packing requirements, shipping documents and handover responsibilities.
Share the earlier project reference, quantities, target dates and any changes. Discuss file-sharing requirements before exchanging sensitive documents.
Discuss the sample and specification from the earlier order.
Review the revisions and the relevant approval references.
Discuss the evidence that applies to the next order.
The identified physical sample, specification, applicable artwork and material or finish references, together with the approval scope and responsible reviewer. The method used to link these references must be agreed; no existing numbering system is claimed.
Changes affecting structure, dimensions, material, artwork, finish, product fit, quantity, packing or destination should be raised for discussion. Agree the affected references and what needs another approval before the next order.